Workload spikes
A hospital award, a data-center hall, or three projects starting the same month. Permanent hiring is too slow. Alloy converts fixed overhead into a project-specific cost.
Independent fire & security delivery
Alloy is a specialized delivery firm for complex fire alarm and electronic security work. We deploy senior design, engineering, and project-management capacity when integrators, electrical contractors, and owners cannot staff the job internally.
The gap
A hospital award, a data-center hall, or three projects starting the same month. Permanent hiring is too slow. Alloy converts fixed overhead into a project-specific cost.
Projects sold on incomplete assumptions, thin labor, or unclear exclusions. We run the turnover, lock the delivery plan, and reduce downstream risk before the first device is ordered.
National integrators win work where they lack local PMs, AHJ knowledge, or trusted subcontractors. We become the repeatable delivery resource in that market.
CMs manage the building. Rarely does anyone own fire, access, video, and networks across consultants, integrators, electricians, IT, and facilities — until the witness test fails.
For integrators
Everon, Johnson Controls, Convergint, Securitas Technology, Siemens, Honeywell, and strong regionals do not lack work. They lack immediately deployable people who understand codes, contracts, margins, and field sequencing at the same time.
We are not a competitor for the account. We are overflow, specialty, and recovery capacity — white-label or co-branded — so your operations team stays whole.
Prototype designs, site-survey standards, multi-site schedules, vendor qualification, KPI dashboards, and standardized commissioning across a rollout.
Behind, over budget, understaffed, or in dispute. A recovery package is priced for urgency because the exposure already exists.
40 or 80 hours a month. A dedicated design pod. A fractional PM who already knows your tools, templates, and customers.
For owners, developers & construction managers
General contractors manage structure and schedule. They rarely have deep command of fire alarm, access control, video, intrusion, emergency communication, or the network those systems live on. Alloy is the specialist underneath the CM — or directly next to the owner.
Where this pays for itself
Technology scope, basis of design, Division 28 intent, and what “done” means before anyone bids.
Integrator procurement, bid-leveling, and technical evaluation that sees through a low number.
Design review, construction coordination, change-order scrutiny, electrical and IT interfaces.
Testing oversight, commissioning, punch close, turnover packages the facilities team can actually use.
Service lines
We do not sell “consulting.” We sell documented design, managed execution, recovered jobs, multi-site programs, and owner-side control of the technology scope.
Basis-of-design narratives, device layouts, risers, point and door schedules, sequence of operations, cause-and-effect matrices, battery and voltage-drop calculations, BIM coordination, Division 28 specifications, shop-drawing review, record documents.
Contracts distinguish conceptual, permit, delegated design, shop drawings, and sealed PE work. Where a jurisdiction requires a licensed engineer, Alloy partners with a qualified fire-protection or electrical PE.
The strongest early offer. Scope and contract review, sales-to-ops turnover, execution plan, baseline schedule, labor and subcontractor planning, cost-to-complete, procurement tracking, weekly reporting, RFIs and changes, billing support, field coordination, testing, closeout.
For jobs that are late, over budget, understaffed, missing documents, facing LDs, or in dispute. Premium pricing, short diagnostic, then a recovery plan the GC and owner can live with.
Standards, prototypes, survey protocols, rollout planning, vendor qualification, multi-site schedule and cost dashboards, quality audits, standardized commissioning, closeout libraries.
We do not try to run the entire building. We make sure the technology scope is defined, bought correctly, coordinated, tested, and turned over.
How an engagement starts
You tell us which side of the table you sit on, what is failing or about to start, and the constraint that matters — date, dollars, AHJ, or reputation.
We will not represent the integrator and the owner on the same project. If there is a conflict, we say so before a proposal exists.
Contract documents, estimate assumptions, current schedule, open RFIs, subcontractor status. A written risk view — not a slide deck of capabilities.
Monthly retainer, dedicated resource, fixed-fee package, or T&M with a not-to-exceed. Senior PM work is not priced like staff augmentation.
Named lead, project controls, weekly status the executive sponsor can read in four minutes. Portal access from day one.
| Role | Indicative range |
|---|---|
| Senior project manager | $150–$225 / hr |
| Program / executive lead | $200–$300 / hr |
| Fire / security designer | $110–$175 / hr |
| Licensed engineering | $175–$300+ / hr |
| Project recovery leadership | $225–$325+ / hr |
Ranges flex with geography, credentials, and risk. We do not win work by being the cheapest body on a job.
Engage Alloy
Four minutes. We route you to the right commercial conversation and, if the fit is real, a named lead inside two business days.
Client portal · model
Data hall 3 · fire alarm, VESDA, access, video wall interface.
High-rise hospital · missed first pretest, subcontractor default.
Standards + 14-site rollout package. Next survey wave Thursday.
| Project | Channel | Status | Next gate | Lead |
|---|---|---|---|---|
| PHX-DC3 Fire + ACS | Integrator | Delivery | Pretest 18 Sep | M. Reyes |
| Mercy Tower renovation | Integrator | Recovery | Re-baseline 9 Sep | A. Okonkwo |
| National grocery prototype | Program | Standards | Wave 1 surveys | S. Patel |
| State U science annex | Owner-side | Bid leveling | Technical eval | C. Nguyen |
Condition: On plan for pretest. Procurement of two delayed speakers remains the only material risk.
This week: Cause-and-effect issued. 62 devices tested. RFI-19 opened on riser conflict at grid D-12.
Need from client: Owner decision on delayed speaker submittal by Friday or pretest slides one week.